As of 4:58 PM, the work on the A Path of Power has been completed. PDU 105A has been connected to the EPO switch, tested and successfully brought back up!
At 5:02 PM, the first of two (2) B Power Path PDUs - PDU 202B - was brought down.
The next update will occur when PDU 202B is connected, tested and brought back up successfully, approximately in 30 minutes.