EPO Switch Commencement - UPDATE

As of 4:58 PM, the work on the A Path of Power has been completed.  PDU 105A has been connected to the EPO switch, tested and successfully brought back up!

At 5:02 PM, the first of two (2)  B Power Path PDUs - PDU 202B - was brought down.

The next update will occur when PDU 202B is connected, tested and brought back up successfully, approximately in 30 minutes.

 