As of 5:01 AM, all CRAC Units on Panel A and Panel MP-1 have been successfully connected to the new permanent ATS.
Corbins Electric is now connecting the CRAC Units from Panel A-1 to the ATS after having successfully shut them down.
We are currently approximately 45 minutes ahead of schedule at the present time.
The next update will be posted at 6:00 AM.
A Meet Me Bridge Line is available at 602-771-9093.